El Salvador Compact - Rural Electrification
?
views
views
?
downloads
downloads
Loading...
General Metadata
- Contractor: Social Impact
- Sector: Energy
- Intervention Type(s): On-grid power infrastructure
- Cross-Sector Theme(s): gender; climate
- Project Objective:
Evaluation Methodology
- Evaluation Type: Impact
- Evaluation Methodology Type: Random Assignment
- Location Type: Rural
Milestones
- Contract Start: September 2007
- Evaluation Design Report Published: October 2009
- Interim Report Published:
- Final Data Package Published: October 2017
- Final Report Publication: March 2017
This study has no related knowledge products.